Performance - Gravel Resheets

 

Gravel resheet performance is listed by life cycle costs ($/m2/yr) in order from lowest to highest for resheets that have reached their end of life.  Also shown are the key variables affecting life cycle cost identified in pilot council testing.  The road conditions prior to resheet is an indication of the end of life of the resheet.

 

Care is to be taken in interpreting the performance reports as there are many factors, which affect life cycle costs including availability and cost of gravel materials, haul distance and modification of materials grading.

 

To see full details for each example, click on the Council name hyperlink.

 

Council

Why work was done

Gravel loss (mm/yr)

Resheet life (yrs)

Traffic (AADT)

% Heavy Vehicles

Vehicle Speed (km/h)

Road conditions pre resheet

Wangaratta (RC)

Programmed resheet program

#N/A

11

150-500

1-5%

60-80

30% bare areas

Wangaratta (RC)

Programmed resheet program

#N/A

11

100-150

0-1%

80-100

30% bare areas

Wangaratta (RC)

Programmed resheet program

#N/A

11

50-100

1-5%

>60

30% bare areas

Northern Grampians (S)

Programmed resheet program

4

14

150-500

5-10%

80-100

Partial gravel cover

Northern Grampians (S)

Programmed resheet program

4

15

150-500

5-10%

60-80

Partial gravel cover

Ararat (RC)

Total gravel loss from road

7

20

150-500

5-10%

60-80

Total gravel loss

Ararat (RC)

Partial gravel loss from road

6

20

0-50

1-5%

60-80

Partial gravel cover

Ararat (RC)

Partial gravel loss from road

5

20

50-100

0-1%

60-80

Partial gravel cover

Ararat (RC)

Partial gravel loss from road

5

20

150-500

1-5%

60-80

Partial gravel cover

Ararat (RC)

Partial gravel loss from road

5

20

150-500

>10%

60-80

Partial gravel cover

 