SAMPLE DETAIL REPORTS

 

Performance - Renewal of failed pavements (pavement has reached end of life)

 

Council

Northern Grampians (S)

Road Name

Banyena Rd

From

0

To

1600

Length (m)

1600

Width (m)

6.2

What was done

Rehab of existing pavement

%age renewed

100%

Renewal Cost

$77,397

Renewal Cost ($/m2)

$7.80

Actual pavement life (yrs)

40

Life cycle cost of old pavement ($/m2/pa)

$0.38

Current replacement cost of old pavement

$150,000

Current replacement cost of old pavement ($/m2)

$15.12

Residual value of old pavement

$72,603

Residual value of old pavement ($/m2)

$7.32

Traffic carried by old pavement (vehicles)

4,745,000

Heavy vehicles carried by old pavement

355,857

Urban/rural

Rural

Why work was done

Pavement failed for some time

AADT

150-500

&age heavy vehicles

5-10%

Subgrade Design CBR

0

Contact officer

Anton Dreyer

Phone No.

03 5358 8700

e-mail

dreyera@ngshire.vic.gov.au

 

The situation

TBA

 

Environmental conditions

TBA

 

 

Renewal options considered

TBA

Selected renewal treatment

TBA

 

 

RETURN

 

HOME